Our Projects
-
Feedstock, Utilities and Interconnecting pipelines for TA’ZIZ Industrial Park
ALNASR is appointed to install pipelines system for Sales Gas and Nitrogen sourced from the 52” Th-C to Ruwais pipeline and 48” Mirfa to Ruwais pipeline respectively, situated near Ruwais,...
- Ruwais, UAE
- ADNOC Gas
-
Call out EPC Services Agreement for Tie-in at Shah, Qusahwira and Mender(Part 2)
The project Call-Out EPC Services Agreement for Tie-in at Shash, Qusahwira, Mender (Part 2) is initiated by ADNOC Onshore to sustain/enhance oil production from Shah, Qusahwira, and Mender (SQM) fields,...
- Abu Dhabi, UAE
- ADNOC Onshore
-
EPC for ADCOP remaining works at MOT, MPS and IPS–(Package 1 & 2)
ADNOC Onshore has appointed ALNASR an EPC job for Foam systems modifications and Produced water pipelines at various locations in the UAE.
- Abu Dhabi & Fujairah, UAE
- ADNOC Onshore
-
Design and Construction of KIZAD Gas Network Phase II
Develop a Gas Network supply for JOCIC development in KP-7 Industrial Zone – Area A.
-
Modification of piping supports & turbo expander seal gas at ASAB 1&2
ADNOC Gas appointed ALNASR to carry out modification works to the existing plant pipes and support systems in ASAB 1 and 2 area.
- Abu Dhabi, UAE
- ADNOC Gas
-
Hot HP Separator works at Ruwais West Refinery
ALNASR was appointed to replace an existing HOT HP SEPARATOR with associated works at the Ruwais West Refinery in Abu Dhabi.
- Ruwais, UAE
- ADNOC Refining
-
EPC of Acid Flare line and Flare Tips Upgrade
ALNASR is appointed the EPC contract of Acid Flare line and Flare Tips Upgrade at Habshan 0 and 1 fields. The objective of the project is to Upgrade Habshan 0...
- Abu Dhabi, UAE
- ADNOC Gas
-
Pipeline Integrity Upgrade Project
ADNOC Gas has appointed ALNASR to upgrade the integrity of pipelines at Ruwais and Habshan locations.
- Abu Dhabi, UAE
- ADNOC Gas
-
Design & Construction of KIZAD Gas network Phase 1
ALNASR is appointed to develop a Gas Network supply for JOCIC development in KP-7 Industrial Zone – Area A.
- Abu Dhabi, UAE
- AD Ports
-
Splitting of 18 inch Condensate Pipeline From ASAB to Ruwais
ADNOC Gas has appointed ALNASR the EPC job for Splitting of the existing 18” Asab to Ruwais at Habshan and install new receiver (for Asab to Habshan section) and launcher...
- Abu Dhabi, UAE
- ADNOC Gas