Scope of Works

Phase 2A

All works associated with activating the ACT Phase 1 site, including:

  • Roadworks including street  lighting, utility  ducting  or  road crossings at the road (utilities do not need to be energized).
  • Energized electrical  infrastructure  for  ACT  plot  only  (up  to  the  11/0.4kV substation only – no downstream infrastructure required).
  • Tested and commissioned partial potable / firefighting network
  • Apron along  the  ACT  Phase  1  plot,  including  utility  ducting  and  highmast within the apron area (utilities do not need to be energized).

Phase 2B: All remaining works.