Scope of Works
12″ Gas Pipeline at Ruwais from Station 551 to CRS 709.
30″ OAG Tie-in to IGD-E at SV4 and Beach Stations & OAG Pipeline Valves replacement.
IGDE Interconnection piping works.
12″ Gas Pipeline at Ruwais from Station 551 to CRS 709.
30″ OAG Tie-in to IGD-E at SV4 and Beach Stations & OAG Pipeline Valves replacement.
IGDE Interconnection piping works.