Scope of Works

  • 30” Pipeline from Scraper Launcher at Taweelah CRS to Scraper Receiver within KP-7 designated as Primary Network
  • 30” Pipeline from Scraper Receiver to gas connection for users at Khalifa Port – Secondary Main.
  • 12” Pipeline from secondary main 30” Pipeline to JOCIC plot – Secondary Network.
  • Design, Supply and installation of Cathodic Protection system
  • External coating for all buried Pipelines (including with Sabkha construction).
  • Design, Supply and Installation of NDRC works for the Road Crossings.
  • Power supply for the MOV’s, permanent Cathodic Protection system of the entire Pipeline network, metering skid and lighting system, Distribution Board & HVAC Panel and UPS Power.
  • Design, Supply and Installation of Lights(LED Lights).
  • Design and supply Lighting and Earthing for electrical room at pig receiver station.
  • Develop, design and supply an earthing system for the entire network.
  • Laying of power cable, excavate cable trenches, termination, glanding and commissioning of the power cable from the tie-in point of power supply to the loads.
  • Provide lighting in the shade of CP transformer, CP control panel and main distribution area .
  • Design, Supply and Installation of Custody Flow Metering Skid Package with Z-configuration comprising of Ultrasonic flow metering.
  • Design, Supply and Installation of Self-actuated Twin Pressure Reducing Skid.
  • Design, Supply and Installation to make a Provision of actuated flow limiter valve along with bypass valve equipped with mechanical CV limiter to limit the flow within design limits during phase-1.
  • Design, Supply and Installation of dual redundant fiber optic cable (24 core) along the buried Pipeline network and terminated with patch panel for remote connectivity in phase-II. The FO cables shall be used for communication and LDS.
  • Design, Supply and Installation of Field instrumentation with Instrument Cables and Junction Boxes. Suitable and proper earthing shall be provided for all instrumentation equipment.
  • Contractor shall prepare the Fire Fighting and Safety Equipment layout for each Project area.
  • Supply, Fabrication and Installation of Mechanical Equipment with Piping, Fittings & valves.
  • Supply and Installation of Portable F&G detectors around above ground area within KIZAD gas network for phase-I with 24 x 7 manning to monitor and safeguard gas network during gas leaks.