Design & Construction of KIZAD Gas network Phase 1
-
Type
Oil & Gas
-
Location
Abu Dhabi, UAE
-
Client
AD Ports
Scope of Works
- 30” Pipeline from Scraper Launcher at Taweelah CRS to Scraper Receiver within KP-7 designated as Primary Network
- 30” Pipeline from Scraper Receiver to gas connection for users at Khalifa Port – Secondary Main.
- 12” Pipeline from secondary main 30” Pipeline to JOCIC plot – Secondary Network.
- Design, Supply and installation of Cathodic Protection system
- External coating for all buried Pipelines (including with Sabkha construction).
- Design, Supply and Installation of NDRC works for the Road Crossings.
- Power supply for the MOV’s, permanent Cathodic Protection system of the entire Pipeline network, metering skid and lighting system, Distribution Board & HVAC Panel and UPS Power.
- Design, Supply and Installation of Lights(LED Lights).
- Design and supply Lighting and Earthing for electrical room at pig receiver station.
- Develop, design and supply an earthing system for the entire network.
- Laying of power cable, excavate cable trenches, termination, glanding and commissioning of the power cable from the tie-in point of power supply to the loads.
- Provide lighting in the shade of CP transformer, CP control panel and main distribution area .
- Design, Supply and Installation of Custody Flow Metering Skid Package with Z-configuration comprising of Ultrasonic flow metering.
- Design, Supply and Installation of Self-actuated Twin Pressure Reducing Skid.
- Design, Supply and Installation to make a Provision of actuated flow limiter valve along with bypass valve equipped with mechanical CV limiter to limit the flow within design limits during phase-1.
- Design, Supply and Installation of dual redundant fiber optic cable (24 core) along the buried Pipeline network and terminated with patch panel for remote connectivity in phase-II. The FO cables shall be used for communication and LDS.
- Design, Supply and Installation of Field instrumentation with Instrument Cables and Junction Boxes. Suitable and proper earthing shall be provided for all instrumentation equipment.
- Contractor shall prepare the Fire Fighting and Safety Equipment layout for each Project area.
- Supply, Fabrication and Installation of Mechanical Equipment with Piping, Fittings & valves.
- Supply and Installation of Portable F&G detectors around above ground area within KIZAD gas network for phase-I with 24 x 7 manning to monitor and safeguard gas network during gas leaks.