Scope of Works
Splitting of the existing 18” Asab to Ruwais at Habshan and install new receiver (for Asab to Habshan section) and launcher (for Habshan to Ruwais section) making them as independent pipeline sections. Existing 18” pipeline from Habshan to Ruwais shall be isolated and filled with Nitrogen (temporary mothballed).