Scope of Works

Scope 1 – Replacement Metering System at ASAB-1

A new system including skid with two parallel flow meter/ instrument line up. Each meter runs include MOVs, Gas chromatograph, Flow meters, Temperature Transmitter and Pressure Transmitter. The system also includes flow computers, metering cabinets and supervisory system. To replace the plant turbine meter (125-FT-100) which is old and obsolete by a new turbine meter as per latest technologies for turbine meter.

Scope 2 – Upgrading of Burn Pit B at ASAB-0
Upgrade the Burn Pit B at ASAB-0 to minimize the override gas flaring and new velocity seal type flare tips.