Scope of Works

Replacement / Upgrade of Process Control & Power System – Package A
The scope includes all necessary work required for performance of detail design &
engineering, procurement, construction, pre-commissioning and commissioning assistance for the upgrade of SCADA, Process Control/Shutdown Panel, F&G Panel for RDS-1 to RDS-5 and Electrical system in RDS-1 to RDS-4.

Replacement / Upgrade of Process Control & Power System – Package B
The scope includes all necessary work required for performance of the detail design &
engineering, Procurement, construction, pre-commissioning and commissioning assistance the Upgrade of Control Systems, Power Skids, SCADA and Injectors Metering Skids for Water Injection Clusters and Injection Wells.