Scope of Works
Carry out alignment/Setout survey, geotechnical investigations for chamber locations, preparing shop drawings, obtaining construction NOCs, obtaining final grade level/height reference from municipalities, Bulk earthworks for grading, supplying, laying of pipeline in trench, testing, washing, /Disinfection and Commissioning, of DI Main Pipeline of Diameter DN 1600, for a total length of about 43.2 kms from Khuraijah New WDC in RAK to Al Helio WDC and one DN800 DI tap off endcap.